Building Construction Process
Characterizing Building Construction Decision Processes to Enhance DOE. And construction process was obtained through interviews with residential and commercial. The Design and Construction Process, Design and Construction as an. For example, the 60-story Chase Manhattan Building in New York used about 60.
Building Construction process • 1. SCHOOL OF ARCHITECTURE• BUILDING• DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) in Architecture BUILDING CONSTRUCTION 1 [ARC 1523] PROJECT 2: CONSTRUCTION ACTIVITY AND PROCESS JOANNE BERNICE CHUA YUNN TZE 0315905 TUTOR: AR.
Download game inazuma eleven pc tanpa emulator singlelink. CHIN TUCK HING • CONSTRUCTION PROCESS WEEK 1 Activity 1: Survey Work Duration: 7 days Materials: - Equipment: Surveying tripod, Theodolite, Dumpy level, Measuring tape, Excavator Skilled Workers: Land surveyor (1), Soil investigator (1) Technical Information: Built environment and natural surroundings of the site is studied, analysed and data is collected. Trial pitting is carried out to examine soil condition. Excavation boundary is indicated. WEEK 2 Activity 1: Mobilization and Hoarding Duration: 2-5 days Materials: - • Equipment: Machineries, Hoarders Skilled Workers: General workers (4) Technical Information: The site office and construction machineries and equipment are transported to the site. Activity 2: Site Clearing Duration: 14 days Materials: - Equipment: Backhoe loader, Excavator, Bulldozer operator (1), Chainsaws, Tipper truck, Skilled Workers: Backhoe Loader Operator (1), Excavator operator(1), Bulldozer operator (1), General workers (4), Truck driver (1) Technical Information: Specific trees are removed and 300mm of top soil is excavated. The soil is kept away or stored well for reuse due to its high water retentive characteristic. WEEK 3 Activity 1: Site Clearing Duration: 14 days Materials: - Equipment: Backhoe loader, Excavator, Bulldozer operator (1), Chainsaws, Tipper truck, Skilled Workers: Backhoe Loader Operator (1), Excavator operator(1), Bulldozer operator (1), General workers (4), Truck driver (1) Technical Information: Specific trees are removed and 300mm of top soil is excavated.
The soil is kept away or stored well for reuse due to its high water retentive characteristic. • WEEK 4 Activity 1: Earthwork Duration: 3-5 days Materials: - Equipment: Excavator, Compactor, Tipper truck Skilled Workers: Excavator operator (1), Compactor operator (1), Truck driver (1) technical information: The uneven land area is either compacted or filled with earth excavated from site or transferred in to level the ground. Activity 2: Setting Out Duration: 3 days Materials: Nails, Wooden pegs, Profile boards, Stakes, Builder’s line Equipment: Hammer, Measuring tape, Theodolite, Dumpy level Skilled Workers: Site Contractor (1), Site Engineer (1) • Technical Information: Measurements are taken and the boundary lines of the building are marked clearly. WEEK 5 Activity 1: Piling (Grid 5-6) Duration: 10-14 days Materials: Pre-Cast reinforced concrete piles Equipment: Hydraulic piling hammer, Pile integrity tester Skilled Workers: Hydraulic Piling Hammer Operator (1), General workers (6) Technical Information: The first half of the piles are driven down The Pile integrity test (Load test) is carried out to ensure the strength meet the requirement. • WEEK 6 Activity 1: Piling (Grid 1-4) Duration: 10-14 days Materials: Pre-Cast reinforced concrete piles Equipment: Hydraulic piling hammer, Pile integrity tester Skilled Workers: Hydraulic Piling Hammer Operator (1), General workers (6) Technical Information: The second half of the piles are driven down The Pile integrity test (Load test) is carried out to ensure the strength meet the requirement. Activity 2: Pile capping (Grid 5-6) Duration: 10-14 days Materials: Concrete Grade 30, Steel Rebar reinforcement, Timber formwork Equipment: Rebar bending machine (1), Cement mixer (1), Skilled Workers: Rebar benders (2), General workers (6) Technical Information: Steel rebar are bended to form a cage and put into position with starter bar protruding outwards. Concrete is poured into the erected formwork and is left to cure.
• WEEK 7 Activity 1: Pile capping (Grid 1-4) Duration: 10-14 days Materials: Concrete Grade 30, Steel Rebar reinforcement, Timber formwork Equipment: Rebar bending machine (1), Cement mixer (1), Skilled Workers: Rebar benders (2), General workers (6) Technical Information: Steel rebar are bended to form a cage and put into position with starter bar protruding outwards. Concrete is poured into the erected formwork and is left to cure. Activity 2: Stump on pile cap (Grid 5-6 ) Duration: 7–14 days Materials: Concrete Grade 30, Steel rebar reinforcement, Timber formwork Equipment: Concrete Vibrator (1), Rebar bending machine(1), Carpentry equipment, Theodolite Skilled Workers: Carpenter(2), Rebar Bender (1), General worker (4), Land surveyor (1) Technical Information: The height of the stump is adjusted to keep the floor levelled. Steel rebar are bended to form a cage and put into position with starter bar protruding outwards. Concrete is poured into the erected formwork and is left to cure. • WEEK 8 Activity 1: Stump on pile cap (Grid 1-4 ) Duration: 7–14 days Materials: Concrete Grade 30, Steel rebar reinforcement, Timber formwork Equipment: Concrete Vibrator (1), Rebar bending machine (1), Carpentry equipment, Theodolite Skilled Workers: Carpenter(2), Rebar Bender (1), General worker (4), Land surveyor (1) Technical Information: The height of the stump is adjusted to keep the floor levelled.